Batwind is connected and Masdar and Equinor are ready to feed it data

LinkedIn
Twitter
Reddit
Facebook
Email
Screenshot taken from Batwind video promo. Image: Equinor/Masdar.

‘Batwind’, a much-talked about battery storage project due to being the first grid storage system connected to an offshore floating wind farm 25km off the Scottish coast, is now online.

In January, the project was described as holding great potential to learn from in showing how renewable energy could become a provider of baseload energy, by Statoil (now known as Equinor) and Masdar, two of the project’s partners which have committed to studying and analysing its performance.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The 1MW/1.3MWh ‘Batwind’ battery, designed and constructed by system integrator Younicos, is now complete and paired with ‘Hywind Scotland’, the floating offshore wind farm near Peterhead, Aberdeenshire.

“By adding energy storage capabilities to another world “first” – the world’s first floating wind farm – we hope to demonstrate the essential role that storage plays as we continue pushing the frontier in producing sustainable energy,” Younicos managing director Karim Wazni said.

“Specifically, we’ve equipped Batwind with our intelligent Y.Q software, which ensures that the battery ’learns’ the optimal storage conditions. Our software tells the battery when to store electricity and for how long, and when and how much to inject back onto the grid.”

Equinor has described the project as the first step towards a “scalable, global renewables energy storage system” and said it and Masdar are together developing the algorithms that instruct the system when to store power and when to send it to the grid. The software behind the algorithms will incorporate various data sources including weather forecasting, market pricing, maintenance, expected consumption data and how, when and if to provide grid services.

“Digitalisation is a key driver here. The more we feed Batwind’s power management system with data, the smarter it gets. In addition, Batwind can be utilised for other renewable energy sources including solar and onshore wind. We believe this will expand the market for all renewable energy sources,” Sebastian Bringsvaerd, development manager for Hywind and Batwind with Equinor.

“The value in storage is not necessarily in the amount of energy you can store, but how you optimize, control and offer smarter energy solutions. By developing Batwind we get real time data, commercial experience and technical verification,” Bringsvaerd said.

The project has been funded by Abu Dhabi-headquartered Masdar and Equinor and supported by UK technology innovation and research centre for offshore renewable energy, Offshore Renewable Energy Catapult.

1 July 2025
Leonardo Royal Hotel London Tower Bridge, London, UK

Read Next

April 17, 2025
Power generation firm Hidroelectrica has enlisted local firms Prime Batteries Technology and Enevo to deploy a large-scale BESS project in Romania.
April 15, 2025
LS Electric will deploy a 20MW/90MWh battery storage system in Japan after it was awarded the contract through a competitive solicitation.
April 14, 2025
ACE Power has announced that the Australian government has permitted the development of 5.6GWh of BESS in Queensland.
April 14, 2025
Samsung C&T Renewable Energy Australia has submitted plans for a 320MWh battery storage system in New South Wales to Australia’s EPBC Act.
April 10, 2025
A 238.5MW/477MWh standalone battery energy storage system (BESS) has been commissioned in South Australia, and an optimisation deal signed for another of the state’s largest BESS assets.

Most Popular

Email Newsletter