Narada completes first commercialised energy storage system in China

LinkedIn
Twitter
Reddit
Facebook
Email

Narada provided EPC services for the 1.5MW energy storage system. Image: Narada
A large-scale energy storage system designed and developed by Narada Power for GCL Silicon has successfully been put into service. The system now stands as the first commercialised energy storage system in China.

For this 1.5MW project, Narada has served as an EPC to provide overall design, procurement and construction services, while also offering additional tasks such as electricity consumption management, operation and maintenance.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Along with this first commercialised energy storage system (ESS), Narada is currently working on the largest ESS for an industrial park in China, with a total capacity of 15MW.

Chen Bo, the president of Narada, said: “In the future, on the basis of continuous reduction of cost per kWh, Narada will keep carrying forward the novel business model 'Investment and Operation' in ESS commercialization, and will contribute to sustainable development of energy for the whole world by continuous innovation, technology improvement, and commercialization of smart energy."

Read Next

April 16, 2025
ESN speaks with IHI Terrasun on the impact of reciprocal tariffs on the US BESS supply chain and how that supply chain could be impacted soon.
April 14, 2025
Tariffs announced on ‘Liberation Day’ have already caused battery storage project deals to fall through in the US, Energy-Storage.news has heard.
Premium
April 9, 2025
ESN Premium speaks with Senior Director of Strategic Sourcing at Anza Renewables, Ravi Manghani on current challenges energy storage developers are facing
Premium
April 9, 2025
A total of 10.9GWh of grid-scale BESS entered commercial operations in March, up 29% year-on-year and 3% month-on-month. 
April 3, 2025
Donald Trump has announced his sweeping ‘Liberation Day’ global tariffs, with another new China tariff resulting in an effective doubling of the price of batteries and BESS imported from there to the US.

Most Popular

Email Newsletter