European Investment Bank loans Iberdrola €108 million for pumped hydro upgrade in Spain

LinkedIn
Twitter
Reddit
Facebook
Email

The European Investment Bank (EIB) has committed €108 million to upgrades at a pumped hydro energy storage (PHES) project in Extremadura, Spain.

The European Union (EU) long-term lending institution owned by the EU’s Member States has signed two green loans with Iberdrola, the Spanish multinational electric utility announced on Monday (14 April).

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The money will be used for upgrades to increase the efficiency and pumping capacity of Valdecañas, a pumped storage hydroelectric complex in Cáceres, a city in the Extremadura region about 300km southwest of Madrid.  

The plant, on the Tagus River near Spain’s border with Portugal, utilises natural topographical features and two large reservoirs to enable water to be released from above to run through turbines and generate power.  

The upgrades include the addition of a hybrid short-duration 7.5MW/15MWh battery energy storage system (BESS) and an increase in the PHES facility’s output to 225MW.

Together the upgrades will enable the Valdecañas complex to reach a maximum pumping capacity of 313MW and 210GWh of long-duration energy storage (LDES) capacity.

After receiving government approval for the plans, Iberdrola installed the first turbines in February this year. At that time, the company said the project would have a relatively low environmental impact as the upgrades comprised electrical works and no civil engineering would be undertaken.      

The loans comprise €50 million of the EIB’s funds and €58 million from the Regional Resilience Fund, or Fondo de Resiliencia Autonómica (FRA) in Spanish.

FRA supports access to financing for Spain’s autonomous regions and is part of the Recovery and Resilience Facility, the EU programme to make Member States more sustainable and address economic challenges.

Iberdrola already operates Europe’s largest PHES facility, La Muella II, which is also in Spain, with a total installed capacity of 1,767MW, built in stages. In 2022, the company inaugurated a new 880MW/40GWh PHES plant, Tamega, in Portugal.  

The EIB, meanwhile, has pledged funding to other PHES plants in the past couple of years, including a €300 million financing for Salto de Chira, a project in the Spanish Canary Islands territory off the coast of Africa proposed by Red Electrica de Espana and €105 million for the expansion of Kruonis, a pumped hydro plant in Lithuania.

The bank’s energy transition-aligned investments include support for the RePowerEU plan. Between 2015 and 2024, the EIB invested close to €147 billion in the EU’s energy sector, including €33.44 billion for grids and energy storage, €60.15 billion for renewable energy and €53.28 billion for energy efficiency projects. It does not invest in fossil fuel projects.

3 June 2025
Stuttgart, Germany
Held alongside the Battery Show Expo Europe in Stuttgart, Energy Storage Germany spotlights Germany’s rapid ascent in the European storage sector. Once driven by residential demand, utility-scale projects are now surging, with 184 MW added across 44 projects in 2023. With nearly 16 GWh of capacity installed in the first half of 2024, Germany is set to integrate 24 GW of utility-scale energy storage by 2037, creating substantial opportunities.
14 October 2025
London, UK
The UK & Ireland is the most mature and established energy storage market in Europe, with just over 5GW of total operational capacity at the start of 2025. With over 130GW in the pipeline for the UK and Ireland, the growth potential of this market is immense. With this in mind, everyone is asking, ‘how best to maximise battery assets?’ This event has established itself as a key industry platform, bringing together asset owners with the experts who can provide the answers – from optimisers and software providers to O&M specialists and more. The summit will equip the industry for the future, delving into the key pillars of asset management, exploring operational challenges, and spotlighting the latest developments in optimisation and software innovation.
2 December 2025
Rome, Italy
Across two packed days, the Summit focused on three core themes: revenue & trading, the lifecycle of the battery, and optimisation tools. Attendees explored innovative strategies for enhancing asset performance and longevity, with a spotlight on key markets like Germany, Italy, and the UK. Stay tuned for details on the 2025 edition of the Battery Asset Management Summit Europe, where we’ll continue to chart the path forward for energy storage asset management.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

Premium
April 16, 2025
In this blog, ESN Prmeium speaks with Dr Thomas Nann, CEO and co-founder of Allegro Energy on its microemulsion flow battery.
April 16, 2025
With over 9GWh of operational grid-scale BESS (battery energy storage system) capacity in the UK – and a strong pipeline – it’s worth identifying the regional hotspots and how the landscape may evolve in the future. 
April 15, 2025
German companies Energieversorgung Beckum (evb), Westenergie and E.ON Energy Solutions (ESY) have launched construction on a 2.75-hour BESS project in Beckum, Germany, and offered local citizens a chance to invest in it.
April 11, 2025
UK regulator Ofgem has launched a cap and floor investment support scheme to unlock funding for new Long Duration Electricity Storage (LDES).
April 10, 2025
The Queensland government has announced plans to release a five-year Energy Roadmap and transferred oversight of a 20GWh PHES project.

Most Popular

Email Newsletter