ACE Power swaps solar PV plant for 2GWh grid-connected BESS in Queensland, Australia

LinkedIn
Twitter
Reddit
Facebook
Email

Renewable energy developer ACE Power has submitted a 2,000MWh battery energy storage system (BESS) in Queensland to Australia’s Environment Protection and Biodiversity Conservation (EPBC) Act.

The developer, which recently secured federal government approval for 5.6GWh of BESS in the EPBC Act, intends to develop the Burdekin BESS near Clare, around 76km south of Townsville, a coastal city in northeastern Queensland.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The 500MW/2,000MWh grid-connected BESS will operate within the National Electricity Market (NEM), which covers Australia’s eastern coast and Tasmania.

According to the EPBC Act application, the developer is being pursued via ACE Power’s subsidiary, Burdekin Solar Farm. Development of the site started in 2015, and the initial focus was to build a solar PV power plant with the option of a co-located BESS.

Instead, the project proposer has now submitted a change to the application to the Burdekin Shire Council to reflect that the site is now a standalone BESS, and that the solar component of the project will be separate and optional in the future.

The BESS will connect to the existing network via a new Powerlink substation, Millaroo. A 275kv single-tower double-circuit overhead transmission line will link the Millaroo substation to the existing Haughton River-Strathmore 275kV Powerlink overhead transmission line. You can find the site layout below.

Image: ACE Power.

The site’s construction phase is anticipated to take 18 to 24 months. The BESS will have an operational lifespan of 35 years and will assist with grid reliability, network frequency, and voltage stabilisation. It will also store renewable energy for discharge during periods of peak demand.

Once the operational lifespan has been reached, the developer will decide whether to decommission the site or replace the plant and extend its life for an additional 25 to 30 years. The application said this will be subject to market and economic factors at that time.

Readers of Energy-Storage.news will likely be aware that ACE Power’s Burdekin BESS will be in close proximity to the cancelled 5GW/120GWh Pioneer-Burdekin Pumped Hydro Project, which was once touted as the world’s largest pumped hydro site.

ACE Power’s Australian energy storage portfolio

ACE Power is developing several renewable energy projects in New South Wales, Queensland, Victoria, South Australia, and Western Australia, including BESS.

Perhaps the most notable of its projects is the Hillview Energy Hub Project, which is set to feature around 300MW of solar PV and 300MW wind generation in New South Wales. The project will also feature the company’s largest BESS in its portfolio, a 1,000MW/4,000MWh 4-hour duration system. This is dependent on site constraints and market conditions.

It is also worth noting that the project will be situated in the New England renewable energy zone (REZ), aiming to deliver up to 8GW of new transmission capacity to help deliver further renewable energy generation to the grid.

Earlier this year, the developer submitted plans for a 3.6GWh 4-hour duration BESS in Queensland to the EPBC Act. Called the Nebo BESS, the 900MW project, which will cover 97 hectares, will also include an extension to Powerlink’s Nebo substation. Two underground 275kV circuits will connect the project to this substation.

The project will be located near the rural town of Nebo in the Isaac region, around 956km north of the state capital, Brisbane. It will import electricity from the grid, which will then be stored and exported during peak demand.

According to documents submitted to the EPBC Act, the project will have two 450MW stages that could be developed separately or concurrently. Although the specific details of the BESS technology were not disclosed, the company confirmed that it will utilise lithium-ion technology.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.
11 November 2025
San Diego, USA
The 2024 Summit included innovative new features including a ‘Crash Course in Battery Asset Management’, Ask-Me-Anything formats and debate-style sessions. You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

April 17, 2025
Clean energy trade body American Clean Power Association (ACP) has released a report on energy storage market reforms for regional grid operators based on findings from the Brattle Group.
April 17, 2025
Battery storage developer and operator Spearmint Energy has secured US$250 million for two battery energy storage system (BESS) projects located in Texas, US, totalling 400MWh.
April 17, 2025
A proposed landowner-led 576MWh solar-plus-storage site in Tasmania has been added to Australia’s Environment Protection and Biodiversity Conservation (EPBC) Act.
April 17, 2025
Federation Asset Management has announced its intention to launch a new long-duration energy storage (LDES) investment platform in Australia.
April 16, 2025
Wisconsin, US utility Madison Gas and Electric (MGE) is partnering with We Energies and Wisconsin Public Service (WPS) to purchase 30MW of solar capacity and 16.5MW of battery storage from the High Noon Solar Energy Centre.

Most Popular

Email Newsletter