Long duration flow battery manufacturer CellCube will bring its large-scale vanadium redox flow systems to the UK, with the country’s Capacity Market firmly in its sights, according to Immersa, which the Canadian energy storage company has signed up to partner with.
The scrapping of the UK’s Zero Carbon homes policy is costing occupants of new-build homes more than £200 (US$257.14) per year, essentially three times the targeted savings from a price cap set by the regulator, Ofgem.
UK battery storage developer Anesco has combined its behind- and in front of the meter storage divisions as part of a wider internal restructure which has triggered the loss of 18 jobs.
National Grid, in its capacity as the UK’s Electricity System Operator (ESO), last week launched a new ‘Distributed Resource Desk’ in its control room in a move hailed as a “huge step forward” for electricity flexibility markets.
A local authority in England has unveiled two landmark solar-plus-storage projects on existing landfill sites which aim to be the first of their kind in the UK.
Britain’s government is seeking to remove a significant hurdle for utility-scale co-located storage sites, enabling projects with combined capacities in excess of 50MW to proceed without requiring government consent.
UK developer and constructor of clean energy projects Anesco and Shell’s New Energies division are to partner on a utility-scale battery storage project in Norfolk, east England.
Residents of Ballyferriter village on the Dingle Peninsula in County Kerry are to join the project this month with the installation of domestic energy storage units in 20 homes.
National Grid has outlined how renewables could participate in the UK’s Capacity Market, unveiling technology-specific de-rating factors that range from 1–15%.