Battery with ‘maximum flexibility’ required for Indian mountain state tender

LinkedIn
Twitter
Reddit
Facebook
Email
The battery and solar project will be located in the mountainous state of Himachal Pradesh, facing huge temperature variations. Flickr: Simon

Solar Energy Corporation of India (SECI) has issued a tender for EPC of a grid-connected 2MWac solar PV project linked with 1MW / 1MWh of battery energy storage on government land at Kaza, in the mountainous state of Himachal Pradesh.

The notice of issue (NIT) was released on behalf of Himachal Renewable Limited, a JV between SECI – which was itself established by the Ministry of New and Renewable Energy (MNRE) – and Himachal Pradesh State Electricity Board (HPSEBL).

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The tender is for design, engineering, supply, construction, erection, testing, commissioning including five of O&M services of the plants at the town of Kaza, which is the subdivisional headquarters of the remote Spiti Valley in the Lahaul and Spiti district.

The battery will be located at Rangreek, near Rong Tong Hydro Power Station, 12,000 feet in altitude, facing annual temperature ranges of -40°C to 30°C. The area can see snow of up to six feet in winter months.

The tender noted that the battery “shall be designed for maximum flexibility with regard to site-specific voltages, frequency, phase imbalance, and protection requirements”.

Any battery technology can be used as long it is deemed suitable for the location’s climatic conditions. The batteries will also be containerised.

There was good news for energy storage in India recently with the reduction of the Goods and Service Tax (GST) on lithium-ion batteries.

SECI also recently issued a tender for two 1.5MW(AC) solar power projects with battery energy storage systems of 0.75MW / 2.5MWh each at two locations in the state of Jammu and Kashmir.

Read Next

April 17, 2025
US non-lithium battery technology companies Eos Energy Enterprises and Unigrid have announced partnerships to deploy their tech abroad, striking deals in the UK and India respectively.
April 16, 2025
Wisconsin, US utility Madison Gas and Electric (MGE) is partnering with We Energies and Wisconsin Public Service (WPS) to purchase 30MW of solar capacity and 16.5MW of battery storage from the High Noon Solar Energy Centre.
April 15, 2025
IPP Enlight Renewable Energy has announced the financial close of the 128MW solar and 400MWh battery energy storage system (BESS) Quail Ranch project in New Mexico, US.
April 15, 2025
Acen Australia has secured AU$750 million (US$472 million) in debt financing to support the rollout of its 13GW renewable energy and storage portfolio.
April 8, 2025
GPG has brought online what it claims is Western Australia’s first grid-connected large-scale solar-plus-storage hybrid project.

Most Popular

Email Newsletter