California Energy Commission releases US$46 million for DERS supporting grid reliability

LinkedIn
Twitter
Reddit
Facebook
Email

The California Energy Commission (CEC) has released over US$46 million for the state’s Distributed Electricity Backup Assets (DEBA) Programme.

Announced 23 October, the US$46.14 million is being released through a Grant Funding Opportunity (GFO).

The DEBA Programme provides funding for distributed energy resources (DERS), including battery energy storage systems (BESS), microgrids, and load flexibility technologies that can increase supply or shift load to improve grid reliability and help avoid blackouts during extreme events.

DEBA was established as part of California’s Strategic Reliability Reserve, which was created in 2022 and formed part of Governor Gavin Newsom’s Assembly Bill (AB) 205, which also introduced the CEC’s opt-in certification scheme for BESS projects exceeding 200MWh. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Speaking with Energy-Storage.news at the US Solar & Storage Finance event in Garden Grove, California, CEC Commissioner Noemí Gallardo highlighted the opt-in scheme as a sign of the Commission’s growing role in fast-tracking large-scale storage.

Gallardo noted that the CEC has “approved three projects already,” or, “about two gigawatts”, since the programme’s launch. DEBA represents a parallel avenue stemming from the same 2022 legislation, aimed at channelling funding directly toward grid-reliability-focused BESS deployment.

In 2025, utility-scale developer SB Energy received a US$25 million grant from the CEC, through DEBA, to purchase BESS for a solar and storage project in Riverside County, California.

Submissions for the GFO are due by 26 January 2027. The CEC will hold a pre-application workshop discussing the solicitation on 5 November 2026.

The submission and questions deadlines can be found on the CEC’s website.

26 November 2026
9am GMT / 1pm GST
In this webinar, Florian Didier and Salomé Perperot from Clean Horizon share the approach they use when supporting IPPs through optimiser selection and contract negotiation across Europe. The presentation will be followed by a live Q&A session in which attendees can put their own questions to the speakers. Who should attend: IPPs and developers, asset owners and investors, lenders and financial advisors, and anyone involved in the commercial structuring of battery storage projects.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.
20 April 2027
Renaissance Dallas at Plano Legacy West Hotel, Dallas, Texas, Dallas
Policy, Procurement and Power Demand: Defining the Next Chapter for Energy Storage. Two days in Dallas where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into US storage, this is that room.

Read Next

November 5, 2026
US retail giant Walmart has made a strategic investment in home battery storage firm Base Power, while Sunrun has doubled the size of its home battery VPP in Puerto Rico.
November 5, 2026
Democrats scored major victories in the US Midterm elections, taking both the House and Senate and flipping several long-held Republican strongholds, with changes likely to occur in the clean energy sector.
November 5, 2026
Eku Energy has fully commissioned its 250MW/500MWh Williamsdale BESS in the Australian Capital Territory (ACT).
November 5, 2026
Three developers have secured debt and equity for solar PV, wind and battery storage projects across Australia and New Zealand.
Premium
November 3, 2026
ESN Premium speaks with Zane Zhou of CATL Australia and New Zealand, about TENER+, sodium-ion demand, the Collie BESS and more.