Finland: Foresight Group acquires Nordic country’s largest BESS from FRV

LinkedIn
Twitter
Reddit
Facebook
Email

UK-based infrastructure investor Foresight Group has acquired the 100MW/400MWh Nivala BESS via its Foresight Energy Infrastructure Partners II (FEIP II) fund, in the North Ostrobothnia region of Finland. 

Announced 15 October, Foresight now has a 100% interest in the Nivala BESS, which was originally developed by Fotowatio Renewable Ventures (FRV), the renewable independent power producer (IPP) and developer headquartered in Spain and owned by Saudi Arabia’s Abdul Latif Jameel Energy.

The project is fully permitted, ready-to-build, and the largest BESS project in Finland. The investment is Foresight’s second in Finland, following the acquisition of Puskakorpi, an 88MW BESS project in 2021 via FEIP I.

The company stated that with a 4-hour duration, the BESS is designed to participate in Finland’s wholesale, intraday and ancillary services markets, a significant revenue driver for Finnish BESS, and help support the integration of renewable generation and the decarbonisation of the Finnish power system.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Foresight will continue to develop the project which is expected to commence commercial operations in the second half of 2028.

Earlier this year, Foresight invested in German BESS developer Mirai Power, via FEIP II. Mirai originated a 12.5GW pipeline of projects in Germany, primarily pursuing transmission-connected assets. With Foresight’s backing, Mirai stated it would expand beyond Germany.

Finland is experiencing a boom in BESS development. As is the rest of the Nordic region, which shares a single ancillary services market, but with prices set locally in regional zones across the countries.

As Energy-Storage.news recently highlighted alongside project announcements from the region, Finland’s BESS revenues have dropped steeply over the roughly three years since development began in the country.

Clean Horizon’s Storage Index shows annualised gross revenue peaked in September 2023, when a 1-hour asset earned around €645,000/MW/year (US$724,451/MW/year), a 2-hour asset around €810,000/MW/year, and a 4-hour asset around €845,000/MW/year.

By August 2026, those figures had collapsed to €50,000/MW/year for a 1-hour asset, €78,000/MW/year for a 2-hour asset, and €111,000/MW/year for a 4-hour asset.

The decline reflects a market becoming increasingly saturated. Grid operator FinGrid expects the roughly 1GW of confirmed BESS deployments in place at the start of the year to be joined soon by a further 2.6GW currently under construction, pushing ancillary services revenues lower.

Still, Clean Horizon points out that participation in aFRR and mFRR EAM markets has held up, and rising intraday trading activity could offer new revenue streams going forward.

26 November 2026
9am GMT / 1pm GST
In this webinar, Florian Didier and Salomé Perperot from Clean Horizon share the approach they use when supporting IPPs through optimiser selection and contract negotiation across Europe. The presentation will be followed by a live Q&A session in which attendees can put their own questions to the speakers. Who should attend: IPPs and developers, asset owners and investors, lenders and financial advisors, and anyone involved in the commercial structuring of battery storage projects.
2 February 2027
The Tower Hotel, London, UK
Solar & Storage Finance Europe Summit brings together the developers, investors and lenders financing European solar and storage projects. As grid constraints, curtailment and weaker capture prices put pressure on returns, the summit explores what makes projects bankable, how co-located storage changes the revenue case and where capital providers see investable opportunities. Attendees can compare how their peers structure projects and meet people who could help them move their own projects or investments forward.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.

Read Next

November 24, 2026
Flow battery company CMBLU Energy and California public utility Imperial Irrigation District (IID) have announced a 10MW/100MWh energy storage project that will mark IID’s first deployment of a non-lithium battery system.
November 24, 2026
The US Senate has passed the Bipartisan American Affordability and Jobs Act of 2026 (BAAJA), the permitting reform bill that has been a major source of industry discussion.
November 24, 2026
APA Group has started construction on its 72MW solar PV plant and 52MW/104MWh BESS at Mount Isa in north-west Queensland, Australia.
November 23, 2026
BESS account for 5.3GW of the 8.4GW of new projects added to Australia’s NEM since December 2025, according to AEMO.
November 20, 2026
Another BESS Industry Buzz, looking at what people are discussing in the industry plus some of the most notable quotes from the RE+ trade show, which concluded yesterday.