redT’s vanadium storage systems pass pre-testing for SSE application on Scottish Island

LinkedIn
Twitter
Reddit
Facebook
Email

redT claims this will be the first containerised, utility-scale vanadium flow system deployed globally, in order to help integrate renewable energy. Credit: redT
Vanadium redox flow technology provider redT energy has passed its G59 pre-testing for its 15kW / 240kWh vanadium flow energy storage systems, which are located at the Power Networks Demonstration Centre (PNDC) in Cumbernauld, Scotland.

The units arrived at PNDC in early June. UK-based Utility Scottish and Southern Energy (SSE) has now carried out the testing on site, examining how safely the units could be installed on the Isle of Gigha.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

redT can now begin installing and commissioning of the system on the island. This will be followed by further testing and the full commissioning of the 1.68MWh system with connection to the island’s grid. The purpose of the storage system is to manage grid constraints related to four community-owned wind turbines.

redT claims this will be the first containerised, utility-scale vanadium flow system deployed globally, in order to help integrate renewable energy.

The firm’s energy storage system has a liquid storage medium, which it claims allows for a long life of more than 10,000 full charge/discharge cycles as well as a 100% usable depth of discharge. It has applications in remote power, smart grids, power quality, and other areas of renewable energy management.

The ability of flow batteries to provide long duration storage without degradation is a tempting proposition for renewables developers, as detailed in previous Energy Storage News blog.

David Rutherford, chief executive, PNDC, said: “Storage offers the potential to smooth out the fluctuations of renewable energy electricity production.  Flow machines like the one being demonstrated by redT provide some unique characteristics for the evolving market place. In half a decade, these technologies will be embedded features of our energy market.”

Scott McGregor, chief executive of redT energy, said: “The deployment of this machine to the Isle of Gigha is ground breaking as far as it is represents the first time that contract manufacturing of a large commodity unit such as this has been successfully deployed ahead of commercial production globally.”

1 July 2025
Leonardo Royal Hotel London Tower Bridge, London, UK

Read Next

April 17, 2025
Power generation firm Hidroelectrica has enlisted local firms Prime Batteries Technology and Enevo to deploy a large-scale BESS project in Romania.
April 16, 2025
With over 9GWh of operational grid-scale BESS (battery energy storage system) capacity in the UK – and a strong pipeline – it’s worth identifying the regional hotspots and how the landscape may evolve in the future. 
April 7, 2025
Gilkes Energy has been awarded planning consent for its Earba Pumped Storage Hydro (PSH) scheme.
April 3, 2025
Invinity Energy Systems has been given the green light to deploy a 20.7MWh vanadium redox flow battery system in the UK, the largest in the country.
Premium
March 31, 2025
We hear from XL Batteries and Quino Energy, ‘organic’ chemistry flow battery technology companies, about how they plan to scale up and reduce costs to compete with lithium-ion. 

Most Popular

Email Newsletter