A legal challenge against NextEra Energy Resources (NEER) over the construction of a 250MW/1,000MWh standalone BESS in Georgia has been dismissed by the Superior Court of Fulton County, after several months of litigation.
System operator ISO New England has given the go-ahead for a 300MW/1,200MWh BESS located in Boston, Massachusetts under development by Boulder, Colorado-based developer and IPP Flatiron Energy.