A 100MW battery storage project in the UK connected to National Grid’s transmission network has gone online, developed by Pacific Green on the former site of a coal plant.
Norwegian state-owned power producer Statkraft has enlisted system integrator Fluence for a 50MW, transmission system-connected battery energy storage system (BESS) in the UK.
The UK will have 50GW-plus of energy storage installed by 2050 in a best case scenario attainment of net zero, according to grid operator National Grid’s Future Energy Scenarios report.
A look at this morning’s Energy Storage Summit 2021 keynote discussion, ‘What is the key for really making money from batteries?’ and the panel’s thoughts on the increasingly complex range of revenue pathways.
Following a dramatic start to the year, Energy-Storage.news takes a look at what is driving price volatility in Britain and what battery energy storage could do about it.