Uniper signs 5GWh conditional supply agreement for CMBlu’s organic flow batteries

LinkedIn
Twitter
Reddit
Facebook
Email

German power firm Uniper has entered into a conditional supply contract with organic solid flow battery company CMBlu Energy for the delivery of at least 5GWh of its technology.

The long-term framework agreement runs until 2037 and gives Uniper the option to take delivery of battery systems from CMBlu in tranches of at least 100MWh each, starting in 2027.

It follows a site acceptance test (SAT) of CMBlu’s battery system by Uniper. Both companies are headquartered in Germany.

CMBlu’s SolidFlow battery is based on the unique and patented combination of organic redox flow technology with solid-state storage materials and is specifically designed for market-driven use in the multi-hour range, the company said.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It claims high cycle stability, a lifespan of several decades and non-flammable electrolytes. It also benefits from the absence of critical raw materials such as lithium, cobalt, or nickel, as with most other non-lithium-based battery technologies.

Uniper first announced plans to pilot CMBlu’s tech at a project in Germany back in 2023. It has also tested other flow battery technologies, including that of Dutch firm Elestor, announced the previous year in 2022. It has also looked at the economic feasibility of large-scale green hydrogen storage, winning a small grant from the EU for a project the same year.

Uniper is a spinout of the larger German-headquartered utility and power firm E.ON.

While the firms didn’t which countries they were targeting for deployments, both are headquartered in Germany so the first projects may well be there.

If so that could represent a shift in appetite for the technology. In 2022, a flow battery executive speaking anonymously lamented that the country’s energy sector ‘did not think it needed flow batteries’, instead believing that a combination of lithium-ion for short-duration and green hydrogen for long-duration would suffice.

However, since then the green hydrogen sector has struggled to scale. Perhaps in related developments, flow batteries appear to have become more viable for large-scale projects. In that time, a flow battery firm VoltStorage raised a €30 million venture loan, a 10MWh project has been completed, and power firm LEAG seriously considered building a 500MWh project using iron flow batteries from ESS Inc.

As well as Europe, CMBlu is also active in the US market. We recently caught up with its North America president Giovanni Damato for an interview on ESN Premium.

Energy-Storage.news publisher Solar Media is hosting the Energy Storage Summit EU 2026 in London, UK, on 24-25 February 2026 at the InterContinental London – The O2. ESN Premium subscribers can get exclusive discounts on ticket prices. See the official website for more details, including agenda and speaker lists.

2 December 2026
Italy
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.

Read Next

October 30, 2026
Demand for 8-hour battery energy storage in Australia is “completely artificial” and relies on government underwriting, according to Tesla, which said asymmetric registration can help such projects earn more.
Premium
October 29, 2026
The intense competition between BESS suppliers in the European market and the ever-more dense products available increases technical risk and the possibility of contractual issues further down the line, a France-based advisor said.
October 29, 2026
IPP Sonnedix has put two solar-plus-storage projects into commercial operation in Portugal, coinciding with the government moving to use BESS to strengthen the reliability of its electricity grid.
October 28, 2026
Sodium-ion’s position has strengthened substantially in the past 12 months but its adoption in Europe depends on several key factors including data centres and their use case, an analyst said.
October 28, 2026
BESS developer Kyon Energy has commissioned and put into operation its 137.5MW/282MWh Alfeld BESS project in Germany, potentially the country’s largest to reach that milestone.